Completed Projects

 

Highway T / Labadie Creek Crossing -- Water Main Improvements
The scope of work includes: construction of approximately 1,308 lineal feet of 8-inch diameter water main, including approximately 55 lineal feet of bore and steel encasement under State Highway T, approximately 366 lineal feet of open-trench installation of 8-inch D.I.P. in creek crossings, approximately 100 lineal feet of directional bore installation of 8-inch PVC under existing parking area, approximately 787 lineal feet of open trench installation of 8-inch PVC water main, associated valves, fittings, hardware, and other incidental items.

  • Project Completed: January 2020

Victoria Gardens WWTF Single Pass Sand Filter
The scope of work includes: demolition and removal of an existing sand filter and associated piping, construction of a new concrete sand filter structure, installation of filter media and piping, new chlorine tablet feeder, associated valves and piping, relocating & installing new fencing, site grading, finish grading, seeding/mulching, and other incidental items.

  • Project Completed: December 2019

Lakewood Lagoon Repairs (South Cell)
The scope of work includes: earthwork along slope of lagoon cell, placement of a rip-rap apron around entire berm of lagoon, import fill to raise berm, and other incidental items.

  • Project Completed: October 2019

Lake Serene Water Main Replacement Project
The scope of work includes: construction of approximately 16,800 lineal feet of new water main to replace existing aging pipe within the Lake Serene corridor. Water main replacement will occur along all, or a portion of, North Shore Dr., Box Elder Dr., Cedar St., Ash St., South Shore Dr., Sunset Dr., Cherry Ln., Paw Paw St., Lake View Dr., and Cedar Brook Ln.

  • Project Completed: September 2019